CLEAN BURN CB-2800 Operator's Manual Page 119

  • Download
  • Add to my manuals
  • Print
  • Page
    / 122
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 118
Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
C-1
APPENDIX C
Additional Installation and Maintenance Requirements
The following activities must also be accomplished for furnace installations in the United Kingdom:
Installing a cover over the oil/air regulators on the burner
Installing a fire valve above the burner
Instructions and/or drawings for these activities are provided in this Appendix.
Figure C1 - Installing a Cover over the Oil/Air Regulators on the Burner
Installing a Cover over the Oil/Air Regulators
A cover (C.B. #31185) must be placed over the oil and air regulator to prevent unauthorized
adjustment after the equipment has been commissioned by qualified personnel (Figure C1).
I88904
t
s
1
0
s
2
2
0
-
2
4
0
5
0
-
6
0
H
z
3
W
D
a
n
f
o
s
s
T
y
p
e
B
H
O
6
4
N
r
.
0
5
7
H
7
0
3
6
Page view 118
1 2 ... 114 115 116 117 118 119 120 121 122

Comments to this Manuals

No comments